This is a "Woodland" Cedar Kit-house sold by Linwood Homes in
Milton, Wa. View Linwood Homes website
It's a 2180 sq ft classic northwest Post and Beam Prow House built on a
southeast facing ridge.
Built into the hill, it has
a daylight basement
Began the site prep
work, Summer of 2001
Construction began Spring of 2002
and continues.
View of Building Site Summer 2001 (Looking Southeast ) |
This will be Dave
and Jan's
"getaway/retirement house"
The lot is situated on a north-south ridge, the first of
the
Cascade Foothills.
Dave installing heat tubes in the floor of the basement slab 2002 |
Lumber Arrives! The Linwood Kit Home arrives by two trucks and three trailers |
First wall goes up |
More walls and the house takes shape |
Setting the main beams |
Starting to look like a house |
Siding going on |
View of the rear of the house |
Deck and roof install |
Great room with fireplace |
Final touches to the deck and railing |
View of lower patio and daylight basement entry |
Installing the septic system |
Backfilling the septic tank 2004 |
Wiring the main power panel |
Backfilling the septic system with the new Dozer |
Insulation in the ceiling. Note the true post and beam construction |
Propane tank and piping |
Heating tubes in the main floor |
Radiant heat control panel |
Drywall going up in the greatroom |
Cedar ceiling complete |
Installing the kitchen cabinets 2005 |
Cabinets in place and final leveling |
Picking out the granite countertops |
Shannon painting the upstairs bath |
Railing installation |
Bookshelf System |
Kitchen cabinets complete |
Another view of kitchen cabinets |
Shannon showing the main floor bath |
Installing the basement ceiling |
Permit is signed off! Three years and 360 days (March 2006) |
Now to move on to the finishing touches. Attaching cement board to the fireplace |
Taking the log chosen for the mantle piece to the sawmill More on the Mantle Log |
Mounting the sawn log Mantle above the fireplace |
River rock fireplace Complete |
Basement Stove installation |
Slate Tile Installation |
Basement 100W Digital Ham Station More... |
Solar Hot Tub Experiment |
Completed Kitchen with Slate Floor |
Moving the hot tub from Brier |
This guy had a crane and just put it where we wanted it. |
Final Resting place for the Hot Tub |
Some more Misc building photos...
Foundation pour |
Basement bath groundwork |
Running power from the power pole |
Meter and temporary outlets |
Dave backfilling around the foundation with the JD dozer |
Steps and 2nd floor deck install |
Wiring the upstairs bath |
Upstairs framing and stairs |
Drywall and greatroom |
Recent Developments
Winter Getaway Foreclosure House! in Maricopa AZ More... |
Security Gate More on the Security Gate |
Private Spring Water System More... |
|
Wifi Network |
1-14-12