Constructing the Entrance Road |
||
|
||
![]() The road is first roughed in and then leveled The talus slope below the cliff face provided a very nice base of broken rock, probably accumulated over thousands or even millions of years. |
![]() We knew there were some large boulders in the proposed roadway View photo of this rock after an explosive was applied |
|
|
||
![]() Roughing in the access road |
![]() Starting the landing |
|
![]() Sheesh two more big ones |
![]()
Widening the landing at approximately the
middle of the property |
|
|
||
![]() Keith and Kevin from ALRT having a conversation about another large rock. We were seeing some very nice, large old-growth firs. The region had been logged in 1901 and this slope might have been left alone for "easier pickings".
|
a ![]() The end of the road on 3/12 This is a fairly steep slope and will have to be "cable-logged" |
|
![]() Big boulder uncovered during the road building. Excavator just went around it for now. Note the green line where it was above ground. |
||
![]() Stopped for another pair of big rocks |
|
|
![]() Grapplecat was delivered--Another versatile logging machine. Able to grade a road with a six-way blade and then pick up a one end of a log with the articulated grapple on the rear. Here's one for sale for $135,000 |
Time for some explosives! |
|
![]()
No big deal for ALRT, just another day. |
![]()
Blaster "Jeff" |
|
|
||
![]()
Setting a charge in the other boulder. |
![]() Leveled, packed down and ready for the next step. View a nice promotional photo of the F150. Cutters began felling trees the next day. |
|
|
|
|
|
||
![]() Crossed the bridge and up the hill past the Norwegian Cabin That's Ken from ALRT helping the operator |
![]()
Up the temporary road |
|
![]() Three tools ready to go to work |
||
![]() |
||
![]() |
||
![]() |
||
Copyright © 2022 Valhalla Tree Farm |
||
4/21/22.2 |